Distributed Generation Panel

  • If mains supply fails DG 1 will starts (Master Selector should be at DG1 Position) and connect the power to the load.
  • If DG1 doesn’t start automatically DG 2 will start and connect the power to the load.
  • If mains Supply fails DG 2 will start (master selector should be at DG 2 Position).
  • If DG 2 doesn’t start automatically DG 1 will start and connect the power to the load.