Distributed Generation Panel

  • If mains supply fails DG 1 will starts (Master Selector should be at DG1 Position) and connect the power to the load.
  • If DG1 doesn't start automatically DG 2 will start and connect the power to the load.
  • If mains Supply fails DG 2 will start (master selector should be at DG 2 Position).
  • If DG 2 doesn't start automatically DG 1 will start and connect the power to the load.

Our Features

  • CPRI Type tested
  • Available both indoor and outdoor type
  • Safe and easy to maintain
  • Aesthetically superior
  • Design as per IP standards
  • Stage wise stringent quality checks
  • Excellent breaking performance
  • Compact design and easy to install
  • Suitable space for cable termination